The road bridge is said to enhance safety and transport efficiencies, by now taking Nicholson Road over the railway line which has removed the railway level crossing. The project also involved re-surfacing the roundabout at Nicholson Road, Garden Street and Yale Road.
Although the re-surfaced road and roundabout, and the shared path on the new bridge are now open for public use, nightworks are still being carried out between 7pm and 7am until July. These finishing works call for lane closures and reduced speed limits on Nicholson Road and include kerbing, line marking, anti-graffiti painting and landscaping.
Enhances traffic operations, economic efficiencies and safety by permanently removing the interface between the road and railway line.
For more information please visit project.mainroads.wa.gov.au/nicholsonroad